Construction Update – November 2024

Wing-B of the project is getting ready for inauguration early 2025. Various finishing works such as installation of doors and windows, putty, tiles work, electrical works, plumbing and sanitation works are underway. The total donations received from generous donors since March 2022 is Rs. 3.96 crores. The total expenditure incurred on Wing – A so […]

Construction Update – August 2024

Building Construction Update – Kolkata Wing-B finishing works such as floor tiles, Underground reservoir, Lift installation and other works are underway. The total cost incurred till date amounts to Rs. 14.15 crores. Wing-A foundation piling work which was partially completed last year at an expenditure of Rs. 2.2 crores will resume once funds become available. […]

Construction Update – June 2024

Building Construction Update – Kolkata The brick work and RCC slab for all the seven floors of Wing-B has been completed. Plastering, tiles, plumbing and sanitation, OHT, Lift and other works are underway. The total cost incurred for Wing B construction till date amounts to Rs. 12.13 crores.  Wing-A foundation work which was partially completed […]

Construction Update – April 2024

Building Construction Update – Kolkata The brick work and RCC slab for all the seven floors of Wing-B has been completed. Plastering, tiles, plumbing and sanitation, OHT, Lift and other works are underway. The total cost incurred for Wing B construction till date amounts to Rs. 11.37 crores.  Wing-A foundation work which was partially completed […]

Project Update – February 2024

The brick work in the seven floors of Wing-B is almost completed. Plastering, tiles, plumbing and sanitation, OHT, Lift and other works are underway. The total cost incurred for Wing B construction till date amounts to Rs. 9.64 crores.  Wing-A foundation work which was partially completed last year at an expenditure of Rs. 2.2 crores […]

Project Update – December 2023

The total cost incurred for Wing B construction till date amounts to Rs. 8.38 Crores. So far, the brick work upto the 4th floor has been completed. In Wing-A, the foundation is partially done at a cost of Rs. 2.2 Crores and awaiting further inflow of funds.In total, we have incurred an expenditure of approximately […]

Project Update – September 2023

The total cost incurred for casting concrete slabs on six floors of Wing B amounts to 6.88 Crores. In Wing-A, the foundation is partially done at a cost of Rs. 2.2 Crores and awaiting further inflow of funds.Casting of slabs for the remaining one floor is expected to be completed before Durga Puja, which falls […]

Project Update – April 2023

Dear Donors, Friends and Well-wishers, You are aware that the construction work of Advaita Ashrama’s new building in Kolkata had commenced in the month of May 2022. In the last eleven months, foundation work of “B” wing has been completed and RCC slab for two floors has been cast. The RCC work of the remaining […]